Dry hyperbaric welded tie-in of 20 in pipeline for offshore petroleum unloading facility.
Diving Repairs

Dry hyperbaric welded tie-in of 20 in pipeline for offshore petroleum unloading facility.
Catapult Shack Lifts (2) at beginning and end of USS Abraham Lincoln service at Vigor
Repair ship-damaged breasting dolphin.
Upgrade Port of Tacoma’s Terminal 3 for 100-gauge Post-Panamax cranes.
Provide lift services.
Trench excavation for 3,700 ft, 90 in concrete sewer outfall.
Install 4 pile range towers.
Annual loading arm repair/maintenance at private refining facility.
Remove railroad bridge and abutments from bayou site.
Salvage 350 ft x 45 ft 250 T section of collapsed concrete train trestle submerged