Construction of a new 65′ Clearance High Level Bridge Structure replacing existing Bascule Bridge on
Florida Department of Transportation Pinellas Bayway

Construction of a new 65′ Clearance High Level Bridge Structure replacing existing Bascule Bridge on
Subcontractor to Conti. Install Water Bents 14-25 for the new bridge for US 70 at
Construct concrete pile supported wharf and marshaling yard.
Design/construct 2,500 ft trestle with Ro-Ro ramp connector to 218 ft x 60 ft pierhead.
Design/construct cargo dock. Port to remain fully operational during construction.
Construct ferry landings in Galveston and Bolivar.
Install 1,700 precast concrete piles, construct 1,672 Lft pile-supported concrete container berth and ammonia uploading
Design/construct barge dock, 260 ft concrete access trestle, associated offloading facility.
Construct ship berth, trestle, hose tower moorings, breasting structure upgrades. Dock to remain fully operational
Construct 490 ft unloading berth with 4 independent breasting dolphins, truck access ramp. Founded on