Demolition of existing piers, installation of new 1,500 LF of combi-wall.
Canaveral Port Authority Cruise Terminal 1

Demolition of existing piers, installation of new 1,500 LF of combi-wall.
Construct cellular steel sheet pile dolphins to protect the main bridge pylons.
Design/construct 1,800 ft combi-wall for quay with 50-acre upland work and storage area.
Design/construct container berths 6 and 7, install and concrete encapsulate 1,145 Lft AZ 46/18 pipe
Design-Build approx. 500′ x 30′ wide of trestle and 490′ x 40′ wide main cruise
Construct private boat slip marina.
Construct concrete replacement dock, reinforce bulkhead.
Construct U.S. Navy surface ship degaussing facility. Use only non-magnetic materials.
Construct marine portion of new 75 ft x 3,350 ft bridge and adjacent causeway. Drill
Construct 1,150 ft wharf with steel combi-wall piling system, reinforced concrete bulkhead top. Strict emission