Mechanically dredge approximately 30,000 CY of contaminated soils. Dispose of an upland facility. Disassemble and
Port of Olympia Maintenance Dredging & Crane Removal

Mechanically dredge approximately 30,000 CY of contaminated soils. Dispose of an upland facility. Disassemble and
20 in cutter suction dredge to achieve optimal channel depth.
Mechanical dredge to create new underwater habitat.
20 in cutter suction dredge to achieve optimal depth for private petrochemical dock sites.
Dredge Port of Houston cruise and container terminals. Clean air requirements met using electric-powered dredge.
8 in portable cutter suction dredge of limited-space nuclear power plant water intake channel.
Dredge Port of Miami entrance channel for passage of 1,100-ft cruise ship.
Installation of a new sheet pile berm, maintenance dredging of moorage basin, stabilization of outfall
Turnkey dredge solution to create turning basin for new private cruise ship pier.
Maintenance dredging along 2,800 ft berth area at Port of Tacoma Husky Terminals on the